Thursday, 16 October 2014

Risk Assessment

Risk Assessment

Time and date of shoot: 15.10.14                Location: South Holderness Technology College
Description of what will be filmed: Art model man walking through his day (Day in the life of the Model Man)

Hazard
 Cast member could trip over the model man/ camera wires 
 while they're in use.
Person(s) at risk
 Cast member/crew

Likelihood of hazard 1=least likely
 2 possibly likely
Severity of outcomes 1=lowest risk
 3 sprained ankle (worse case scenario)
Risk Level (1-5) Likelihood+Severity divide 2
 2+3=5 divide by 2 = 2.5
Measure to control risk
 Tape down the wires and keep cast members and crew away
from the model man while it is being used

Person responsible for controlling risk
 The health and safety officer
Final risk level acceptable?

 Yes

I certify that this is a suitable risk assessment. Should there be any changes in the filming plan, date/time or location, the risk assessment will be reviewed and changed as necessary.
Completed by:
Name: Chloe Pellatt    Role: Actor, director and producer

Countersigned by the producer: Chloe Pellatt


Print name: C Pellatt                

No comments:

Post a Comment